ThermoBuilt Feature Project 2017 Utah ThermoBuilt Wall-38 - ThermoBuilt Roof-50 - ThermoBuilt Basement-42 ThermoBuilt Basement Delivery Site Prep Prior to Basement Panel Installation Day One Basement Wall Assembly / 10' Wall / 2 Man Crew Day One Basement Wall Assembly / 10' Wall / 2 Man Crew Day Two Basement Wall Assembly / 10' Wall / 2 Man Crew Post Pour Basement Wall Assembly with Subfloor Insulation Installed / 10' Wall / 2 Man Crew ThermoBuilt SIP Alternative Panel Delivery / Ready to Assemble Floor Framing Assembly Complete ThermoBuilt Basement System Below / ThermoBuilt SIP Alternative Wall Above ThermoBuilt Shell Complete ThermoBuilt Shell Complete